Captain's Brief · Maritime Learning · 2 min read · Nov 9, 2026
Bunker Letter of Protest: What to Do When the Bunkers Come Up Short
Learning guide for engineers and deck officers working toward their next rank. On the day, your company SMS, the charter party, the bunker contract and your P&I correspondent decide. The worked example below is an ILLUSTRATION, not a figure for any real ship or delivery.
Bunkering is finished, the barge master is at the door with the Bunker Delivery Note (BDN), and the ship sails in an hour. Your soundings come out short. Do not sign the BDN as presented. Re-sound with the barge, and if the ship is still short, issue a Letter of Protest (LOP). It takes ten minutes and it protects the owner's and charterer's right to claim.
The short answer
A Letter of Protest is a formal written notice from the ship to the bunker supplier or barge. It records that the ship does not accept something about the delivery and reserves the right to claim later.
- Who issues it: the Chief Engineer, who is normally responsible for bunkering, and/or the Master, on ship's letterhead, signed and stamped.
- Addressed to: the barge master or bunker supplier, with copies to owners, charterers, the agent and the local P&I correspondent.
- When: at once, before the barge leaves. Ask the barge master to sign it as "received". If he refuses, write that refusal on the letter and have it witnessed.
An LOP does not win a claim by itself. It protects the right to claim. Without it, the supplier will say that the ship signed the BDN and accepted the quantity.
ISO 13739:2020, the international standard for bunker transfer procedures, uses the same term, "letter of protest", for this document.
Common reasons to issue an LOP
| Reason | Example |
|---|---|
| Quantity shortfall | Ship's figure lower than the BDN figure |
| Air in the fuel ("cappuccino") | Foam or bubbles in tanks, on the sounding tape or in the sight glass |
| Quality or off-spec | Wrong grade, water, or a sulphur result over the limit |
| BDN discrepancy | Wrong density, sulphur, grade, or date and time on the BDN |
| Samples | No witnessed sampling, unsealed or mislabelled samples, MARPOL sample not provided |
| Checks refused | Barge master will not allow soundings, temperatures or draft readings |
| Delays | Barge arrived late, or pumping was slow and cost the ship time |
Britannia P&I advises that if the Chief Engineer finds the results unsatisfactory, an LOP should be issued stating the reason clearly, for example "foam observed, cappuccino effect", with an entry in the engine logbook.
Worked example: a quantity shortfall (ILLUSTRATION ONLY)
These numbers are made up for teaching and match the video. On board, always read the factors from the official ASTM/API/IP Table 54B (volume correction factor, VCF: observed volume to standard volume at 15 °C, entered with density at 15 °C and the observed temperature) and Table 56 (weight correction factor, WCF: standard m³ to metric tonnes in air). Use the density at 15 °C on the BDN.
BDN figure: 500.000 MT VLSFO, density at 15 °C = 0.9850 kg/L
Ship's figures after bunkering (all bunker tanks sounded, corrected for trim and list):
| Step | Value |
|---|---|
| Total observed volume (soundings + tank tables) | 505.000 m³ |
| Average tank temperature | 50 °C |
| VCF, Table 54B (0.9850 at 50 °C) ≈ | 0.9762 |
| Standard volume at 15 °C = 505.000 x 0.9762 | 492.981 m³ |
| WCF, Table 56 = 0.9850 − 0.0011 | 0.9839 |
| Mass in air = 492.981 x 0.9839 | 485.044 MT |
Difference: 500.000 − 485.044 = 14.956 MT short. 14.956 ÷ 500 = about 3.0%.
A note on the factor. 0.9762 is a rounded teaching figure. The Table 54B calculation for these inputs gives about 0.9758, which works out to roughly 484.85 MT and a 15.15 MT shortfall. Either way the ship is about 3% short. A 0.0004 error in the VCF is worth about 0.2 MT on this delivery, which is why you never estimate the factor on a real BDN.
Is that within tolerance? Many companies use a working threshold, often around 0.5%, as the trigger for re-checking and protesting. This is a company or contract rule, not a universal law. Check your SMS and the bunker contract. A 3% shortfall is well over any normal threshold.
What to do, step by step
- Re-sound all tanks together with the barge representative, and the surveyor if one is attending. Repeat the calculation together.
- Still short? Do not sign the BDN as presented. Sign for the quantity measured on board, or "for receipt only", with a clear remark referring to the LOP.
- Issue the LOP and inform owners, charterers, the agent and the P&I correspondent.
- Re-sound after the fuel settles. Britannia suggests re-checking after about half a day. Fine air bubbles in cold, heavy fuel can take up to two days to escape (West P&I).
- If the BDN was already signed before you found the shortage, notify at once. Some contracts set a notice period of 24 or 48 hours.
- In Singapore, the MPA advises lodging a written complaint to the supplier within 30 days, with a copy to the MPA.
What goes in the letter
[SHIP'S LETTERHEAD]
LETTER OF PROTEST – BUNKER QUANTITY SHORTFALL
To: Master, Bunker Barge [NAME] / [Bunker Supplier]
From: Chief Engineer, MV [NAME], IMO [No.]
Port: [Port] Date/Time: [dd/mm/yyyy hh:mm LT]
BDN No.: [No.] Grade: VLSFO 0.50% S
This letter formally protests the quantity of bunkers delivered
to MV [NAME] by your barge at [port] on [date].
BDN quantity: 500.000 MT
Ship's measured quantity: 485.044 MT
(sounded at hh:mm and re-sounded at hh:mm, witnessed by your
representative; corrected to 15 °C with ASTM Tables 54B / 56
and BDN density 0.9850)
Shortfall: 14.956 MT (approx. 3.0%)
[If applicable: foam/air bubbles observed on the sounding tape in
tank no. __ at hh:mm. / Your representative refused joint
sounding of the barge tanks.]
The BDN is signed for the quantity measured on board only /
for receipt only, subject to final quantity determination.
We hold you and your principals responsible for the shortfall
and any loss, delay or consequences, and we reserve all rights
of the Owners and Charterers to claim.
Chief Engineer: ________ Master: ________ (Ship's stamp)
Received by Barge Master: ________ Date/Time: ________
(If refused: "Barge Master refused to sign", witnessed by ____)
If you receive an LOP from the barge or another party, West P&I suggests signing it "received without prejudice and for receipt only", never as an admission.
How bunker shortfalls happen, and how to catch them
The "cappuccino effect"
Compressed air or gas is blown into the fuel. The fuel foams and swells, so soundings and volumetric meters read high. When the bubbles escape, sometimes days later, the "fuel" is gone.
Signs to watch for:
- Foam or bubbles on the fuel surface in barge tanks before delivery, and in ship's tanks after
- Bubbles or froth on the sounding tape or in the sample
- Sounding levels that keep moving, or drop when you re-sound later
- Gurgling or hissing at vents, a vibrating hose, or fluctuating manifold pressure
- Air hoses connected near barge tanks or lines, or a compressor running for no clear reason
If you suspect air: stop bunkering, find the source, take photos and video, make a logbook entry and issue an LOP. Do not trust volumetric meters when air is present. Let the fuel settle, then sound again.
Soundings and drafts on the barge and the ship
- The Chief Engineer, or a trusted officer, boards the barge before and after delivery and sounds all tanks, including slop tanks and any tank said to be "for another vessel". Both sides sign the sounding record.
- Read the barge's and the ship's drafts before and after. The change in displacement should roughly match the quantity delivered.
- Check the reference height of sounding pipes against the tables. A tampered or extended pipe gives a false reading.
- Use only calibrated sounding tapes and thermometers.
Temperature and density
- Take the temperature yourself at several levels. A temperature reported too high or too low shifts the VCF and the final tonnes.
- Ship and barge should use the same edition of the measurement tables.
- Check that the BDN density makes sense for the grade, and compare it with the lab result later.
Piping and hidden tanks
- Watch for unusual piping, extra valves, bypass lines, or a hose leading back into the barge. These can return fuel to the barge while the meter keeps counting.
- Watch for undeclared compartments and transfers between barge tanks during delivery.
- Report anything odd to the surveyor or the P&I correspondent.
Meters: sealed and witnessed
- Since 1 January 2017, Singapore has required an MPA-approved mass flow meter (MFM) for marine fuel oil bunkering, and the BDN quantity comes from the barge's MFM. The current standard is SS 648:2024, mandatory from 1 April 2025.
- Elsewhere, check that meter seals are intact, record the seal numbers, and note the meter readings before and after.
Sampling: witnessed and sealed
- Continuous drip sampling at the ship's manifold, from start to finish, witnessed by both sides.
- Seal the samples and record the seal numbers on the BDN and the labels.
- Under MARPOL Annex VI, regulation 18, the BDN is kept on board for three years, and the MARPOL delivery sample is retained under the ship's control until the fuel is substantially consumed, and in any case for not less than 12 months.
- If the supplier refuses to witness sampling, or brings pre-filled samples, issue an LOP.
Signatures and timing
- Never sign the BDN before measurements are finished, and never sign blank or pre-filled forms.
- If in doubt, sign with a remark such as "for receipt only, subject to LOP no. __" and call owners, charterers and P&I.
- Do not let sailing pressure rush you. West P&I notes that short bunker calls just before departure carry a higher risk.
Officer's checklist
- Before: bunker plan, tank capacities and sounding tables ready; calibrated tape and thermometer
- Before: barge tanks (including slops) sounded, temperatures taken, drafts read, record signed by both sides
- Before: meter seals checked and recorded; MFM reading noted where fitted
- During: watch manifold pressure, the hose and the vents for signs of air
- During: witnessed drip sampling for the whole delivery
- After: ship's tanks sounded, tape checked for foam, trim and list corrected
- After: converted to MT with Tables 54B and 56 and the BDN density
- Short beyond the company threshold: joint re-sounding, BDN not signed as presented, LOP issued
- Samples sealed, seal numbers on the BDN, MARPOL sample retained
- Logbook entry, photos and video, owners, charterers and P&I notified
- Re-sounded after settling (about 12 hours, longer for cold, heavy fuel)
For the next rank
Expect questions like these in assessments and at interview:
- "The BDN says 500 MT and your figure is 485 MT. What do you do before the barge leaves?"
- "Why do volumetric meters read high when there is air in the fuel?"
- "What do Tables 54B and 56 do, and which density do you use?"
Practise these topics in the Promotion Reviewer: https://maritimematch.ph/seafarers/promotion
This is a learning guide as of November 2026, not a substitute for your company SMS, the charter party and bunker contract, or advice from your P&I correspondent.
Download Maritime Match free on Google Play: https://play.google.com/store/apps/details?id=ph.maritimematch.app
Also on the App Store: https://apps.apple.com/ph/app/maritime-match/id6809177839
Sources (accessed 9 Nov 2026)
- Britannia P&I, Managing bunker quantity disputes: https://britanniapandi.com/en_gb/guidance/managing-bunker-quantity-disputes-essential-practices-and-considerations-for-shipowners-and-operator/
- Britannia P&I, Bunkering precautions and avoidance of bunker quality disputes: https://britanniapandi.com/en_gb/guidance/bunkering-precautions-and-avoidance-of-bunker-quality-disputes/
- West P&I, Bunker disputes: the "cappuccino effect": https://www.westpandi.com/news-and-resources/loss-prevention-bulletins/bunker-disputes-the-cappuccino-effect/
- MPA Singapore, Mass flow meter for bunkering: https://www.mpa.gov.sg/port-marine-ops/marine-services/bunkering/mass-flow-meter-for-bunkering
- MPA Port Marine Circular 12 of 2024 (SS 648:2024): https://www.mpa.gov.sg/media-centre/details/port-marine-circular-no.-12-of-2024-implementation-of-singapore-standard-ss-648--2024---code-of-practice-for-bunker-mass-flow-metering
- MPA, Bunkering 101 placards (30-day complaint): https://www.mpa.gov.sg/api/media/4558c1be-d5d3-482c-b38e-b5cca5f115fa/bunkering-101-placards-v2.pdf
- ISO 13739:2020, Procedures for the transfer of bunkers to vessels: https://www.iso.org/standard/70786.html