SEA TOOLS
Air Draft & Bridge Clearance
Trim, draft survey & load line
How to use
- Set up My Ship once (paste hydrostatics, holds, tanks from your booklet).
- Work through loading in order: plan cargo, check load line, trim to finish, then survey.
- Soundings feed Draft Survey deductibles; export or print trim and survey worksheets.
Example values — edit any field.
Reference worksheets only. Verify every result against your ship's approved loading computer, stability booklet, and company procedures.
Reference only — verify with official charts, pilot books, port authority and passage plan. Charted clearance datum (HAT) is a label only; you must use the correct publication for the obstruction.
Draft at point8.333 m
Air draft36.67 m
Clearance under obstruction3.33 m
Margin after required1.33 m
PASS — margin meets required safety