SEA TOOLS
Trim & Draft Planner
Trim, draft survey & load line
How to use
- Set up My Ship once (paste hydrostatics, holds, tanks from your booklet).
- Work through loading in order: plan cargo, check load line, trim to finish, then survey.
- Soundings feed Draft Survey deductibles; export or print trim and survey worksheets.
Example values — edit any field.
Reference worksheets only. Verify every result against your ship's approved loading computer, stability booklet, and company procedures.
After load — F8.656 m
After load — A8.773 m
Trim11.7 cm
2-hold remaining total2074.5 t
Forward hold1089.8 t
Aft hold984.8 t
Port/stbd draft difference0.563 m
