Cargo Plan

Trim, draft survey & load line

How to use
  1. Set up My Ship once (paste hydrostatics, holds, tanks from your booklet).
  2. Work through loading in order: plan cargo, check load line, trim to finish, then survey.
  3. Soundings feed Draft Survey deductibles; export or print trim and survey worksheets.

Example values — edit any field.

Reference worksheets only. Verify every result against your ship's approved loading computer, stability booklet, and company procedures.

Use m³/t (not ft³/LT). Entering 42 as m³/t is a common units mistake.

1 (10000 m³)7142.9 t · 85.7% fill
2 (12000 m³)8571.4 t · 85.7% fill
3 (12000 m³)8571.4 t · 85.7% fill
4 (12000 m³)8571.4 t · 85.7% fill
5 (10000 m³)7142.9 t · 85.7% fill

Weight to shift218.2 t
Send shift to trim planner
Two-layer hold KG5.643 m

Hand calc: (3000×2.5 + 4000×8.0) / (7000) = 5.643 m

SF from part load1.30 m³/t