SEA TOOLS
Cargo Plan
Trim, draft survey & load line
How to use
- Set up My Ship once (paste hydrostatics, holds, tanks from your booklet).
- Work through loading in order: plan cargo, check load line, trim to finish, then survey.
- Soundings feed Draft Survey deductibles; export or print trim and survey worksheets.
Example values — edit any field.
Reference worksheets only. Verify every result against your ship's approved loading computer, stability booklet, and company procedures.
Use m³/t (not ft³/LT). Entering 42 as m³/t is a common units mistake.
1 (10000 m³)7142.9 t · 85.7% fill
2 (12000 m³)8571.4 t · 85.7% fill
3 (12000 m³)8571.4 t · 85.7% fill
4 (12000 m³)8571.4 t · 85.7% fill
5 (10000 m³)7142.9 t · 85.7% fill
Weight to shift218.2 t
Send shift to trim plannerTwo-layer hold KG5.643 m
Hand calc: (3000×2.5 + 4000×8.0) / (7000) = 5.643 m
SF from part load1.30 m³/t
